The flyer identifies commercial facilities as an application context, not a customer or project claim.
APPLICATION / Buildings
Commercial & Public Buildings
Explore distribution equipment for building and campus projects; review space, access and safety constraints first.
PÉRIMÈTRE DU SCÉNARIO
Ce que couvre cette application.
The prefabricated-substation flyer names commercial facilities as an application context. Space, access, noise and safety requirements must be confirmed for each building.
DONNÉES DE CONCEPTION
- Building load schedule and incoming supply arrangement
- Required transformer capacity, voltage and protection scheme
- Plant-room access, footprint, ventilation and noise limits
- Metering, fire, ingress and commissioning documentation needs
AVANT LE DEVIS
Ce qui doit encore être confirmé.
Confirm the building authority requirements and exact configuration before tender use.
CORRESPONDANCE DOCUMENTS–PREUVES
Familles de produits à examiner.
Ces liens reflètent le statut des éléments de preuve présenté sur cette page. Ils ne constituent ni des recommandations d'équipements, ni des références de projets, ni une preuve d'adéquation sectorielle.
Prefabricated Substations
The published prefabricated-substation flyer names commercial facilities.
- Structure
- Three-compartment integrated (HV / transformer / LV)
- Enclosure protection
- IP44
- Mechanical impact resistance
- IK10
- Noise level
- ≤ 45 dB(A) (measured 37 dB(A))
ÉTAPE SUIVANTE
Envoyez les données du réseau et l'environnement.
Classe de tension, courant assigné, niveau de court-circuit, environnement d'installation et normes auxquelles votre projet est soumis.