The flyer identifies commercial facilities as an application context, not a customer or project claim.
APPLICATION / Buildings
Commercial & Public Buildings
Explore distribution equipment for building and campus projects; review space, access and safety constraints first.
LÍMITES DEL ESCENARIO
Qué cubre esta aplicación.
The prefabricated-substation flyer names commercial facilities as an application context. Space, access, noise and safety requirements must be confirmed for each building.
DATOS DE DISEÑO
- Building load schedule and incoming supply arrangement
- Required transformer capacity, voltage and protection scheme
- Plant-room access, footprint, ventilation and noise limits
- Metering, fire, ingress and commissioning documentation needs
ANTES DE LA COTIZACIÓN
Lo que aún debe confirmarse.
Confirm the building authority requirements and exact configuration before tender use.
CORRESPONDENCIA ENTRE DOCUMENTOS Y EVIDENCIAS
Familias de productos que revisar.
Estos enlaces reflejan el estado de la evidencia mostrado en esta página. No son recomendaciones de equipos, referencias de proyectos ni pruebas de idoneidad sectorial.
Prefabricated Substations
The published prefabricated-substation flyer names commercial facilities.
- Structure
- Three-compartment integrated (HV / transformer / LV)
- Enclosure protection
- IP44
- Mechanical impact resistance
- IK10
- Noise level
- ≤ 45 dB(A) (measured 37 dB(A))
SIGUIENTE PASO
Envíe los datos de la red y del entorno.
Clase de tensión, corriente nominal, nivel de cortocircuito, entorno de instalación y normas conforme a las que se licita el proyecto.