The flyer identifies commercial facilities as an application context, not a customer or project claim.
APPLICATION / Buildings
Commercial & Public Buildings
Explore distribution equipment for building and campus projects; review space, access and safety constraints first.
حدود السيناريو
ما يشمله هذا التطبيق.
The prefabricated-substation flyer names commercial facilities as an application context. Space, access, noise and safety requirements must be confirmed for each building.
مدخلات التصميم
- Building load schedule and incoming supply arrangement
- Required transformer capacity, voltage and protection scheme
- Plant-room access, footprint, ventilation and noise limits
- Metering, fire, ingress and commissioning documentation needs
قبل عرض السعر
ما يزال بحاجة إلى تأكيد.
Confirm the building authority requirements and exact configuration before tender use.
مطابقة الوثائق والأدلة
عائلات المنتجات المطلوب مراجعتها.
تعكس هذه الروابط حالة الأدلة المعروضة في هذه الصفحة. وهي ليست توصيات للمعدات أو مراجع لمشاريع أو إثباتاً لملاءمة القطاع.
Prefabricated Substations
The published prefabricated-substation flyer names commercial facilities.
- Structure
- Three-compartment integrated (HV / transformer / LV)
- Enclosure protection
- IP44
- Mechanical impact resistance
- IK10
- Noise level
- ≤ 45 dB(A) (measured 37 dB(A))
الخطوة التالية
أرسل بيانات الشبكة والبيئة.
فئة الجهد والتيار المقنن ومستوى القصر وبيئة التركيب والمعايير التي طُرح مشروعك وفقاً لها.